222 Mapleview Dr. W., Ste. 300, Barrie, Ontario L4N 9E7

Albert St. and John Dillingno St. Road Reconstruction

Project Manager

Jeff McCuaig, P. Eng.

Technical Members

Peter Derro, P. Eng.

Related Services

Project Overview

We were responsible for the topographical survey, preliminary and detailed design, and preparation of tender specifications and construction cost estimates. The road reconstruction project required the urbanization of approximately 1.0 km of road (Albert St. and John Dilllingno St.) from a rural cross section, implementing the use of a storm sewer network and ultimately resolving the existing drainage/ponding issues. As part of this project, over 700m of storm sewers were proposed to be installed and integrated with the existing storm drainage catchments.

This project did not extend beyond the design phase due to budgetary constraints.

Project Features