Charleston Sideroad Reconstruction

Project Manager

Jeff McCuaig, P. Eng

Technical Members

Ray Collins, BBA., C. Tech.

Adam Yang

Related Services

Project Overview

GEL was responsible for the Preliminary and Detailed design, preparation of Tender Specifications, Construction Cost Estimates, Contract Administration and Inspection for the reconstruction and widening of approx. 0.3km of Regional Road 24 in the Town of Caledon, Region of Peel. The assignment was carried out to create truck turning lanes at the entry to the Lafarge Pit. Design work included optimization of horizontal geometry for turning lanes, roadside hazard assessment, the staging of construction to maintain services to affected residents, and traffic management to maintain flow of traffic throughout work zone.