222 Mapleview Dr. W., Ste. 300, Barrie, Ontario L4N 9E7

Vista Blue Condominiums

Tettenham, Ontario, Canada

Project Manager

Jesse Longworth, P. Eng.

Technical Members

Josh Small, P. Eng.

Peter Binsted, PhD, P. Eng.

Ryan King

Related Services

Project Overview

Welcome to Vista Blue, an exquisite six-storey condominium development nestled in the idyllic community of Tottenham. Designed with a contemporary aesthetic, Vista Blue showcases nine-foot ceilings in every suite, creating a spacious and airy ambiance. The innovative Composite TotalJoist floor system efficiently houses almost all the building services, maximizing functionality and design. Spanning an impressive 84,000 square feet, this 62-suite condominium includes amenities spaces, a communal green area, and a meticulously designed storm-water management pond. The unique sloped site of Vista Blue showcases a magnificent seven-storey southern-facing elevation that gracefully transitions to six storeys, offering an architectural masterpiece that seamlessly blends with its surroundings. This layout also allows for the optimal placement of the underground parking structure.

Project Features

• Cast-in-Place Foundations, Below Grade Structure, and Transfer Slab

• iSPAN Light-Gauge Steel Super Structure

• In-Suite HVAC Equipment

• Sewage Pumps

• Exterior Snow Melt System on Entrance Ramps

• Fire Alarm Design integrated with the Sprinkler System