Project Manager
Jeff McCuaig, P. Eng.
Technical Members
Peter Binsted, Ph. D., P.
Eng., LEED AP
Peter Derro, P. Eng.
Ray Collins, BBA, C. Tech.
Kevin Filion, C. E. T.
Project Features
Hydrologic Modeling
MOE & CA Approvals
Traffic Impact Study
We provided preliminary and detailed design for the reconstruction works of 10thSide Road and 14th Line to be completed as part of Phase 3 of the Treetops Development. The upgrades include urbanization of the existing rural cross section and implementation of a new storm conveyance system, including quality controls sized to adequately convey the 5-year design event, and a complete redesign of the street lighting.
The reconstruction works involve approximately 3.0 km of storm sewers sized up to 1,200 mm diameter with various inlet structures to accommodate all contributing drainage areas. Quality controls are provided through the use of four oil/grit separators providing a minimum TSS removal of 80%.